Patios and decks.
Built to match the pool.
Concrete, paver, or composite — we design the deck and the pool as one project so the lines work.

What's included
Layout design
Sized to the pool, the yard, and how you'll actually use it.
Material choice
Concrete, paver, or composite — we walk you through pros and cons of each.
Install
Base prep, drainage, finish — done right the first time.
Add-ons
Built-in seating, fire pit, lighting, planters — built in or added later.
Recent work






Why Adams
Patio + pool, one quote
We're already on site for the pool — adding a patio is the easiest project you'll ever schedule.
Drainage done right
PA freeze-thaw breaks bad concrete fast. We base everything properly the first time.
Built to match
Pool decking, walkways, and steps all use the same materials and lines.
Frequently asked
What material lasts longest in PA weather?
Properly-installed paver patios handle freeze-thaw best. Concrete needs a real base. Composite is the easiest to maintain but the most expensive.
Can you tie an existing pool into a new patio?
Yes — we'll match the coping and tile work as closely as possible.
How long does install take?
Most patios are 1–2 weeks from base prep to final finish.